The Pier | North Vancouver, BC

Summary:
Water bearing sands being fed from the mountains above the base of the north shore mountains were intercepted with the shoring required for the Esplanade Development "The Pier" which required jet grouting to seal the water prior to excavating.
Date:
January 2006
Client:
Mondiale Development
jetgroutshoring001.jpg

The initial design showed an anchored shotcrete shoring wall down thru ~38’ of glacial tills required a new shoring solution when Artesian conditions and flowing sands were discovered preventing conventional shoring. The difficult ground conditions precluded the option of using face saving measures.

The joint venture between SWC and Condon-Johnson & Associates, Inc. created an alternative by forming in-situ Jet Grout Columns reinforced with HP Piling as soldier type piles. Two rows of tie-back anchors replaced the four rows originally designed thus providing some cost savings to offset costs.

This specialized foundation shoring system was able to advance thru difficult ground conditions, including artesian pressure coupled with sands and gravels.

Scope of Work

Jet grout columns: ~ 140 each x 2.4’ c/c x 2.6’ F
Length of wall: 336 LFt
Average depth: 24’ so 6’ below grade
Face area of wall: ~ 8,200 square feet
Soldier piles: 4.8’ c/c
Ground conditions: Tills overlying Artesian conditions including flowing sands

jetgroutshoring002.jpg
jetgroutshoring003.jpg
jetgroutshoring004.jpg