Miller Creek Soil Anchors | Pemberton, BC

Summary:
"Run of the river" hydroelectric power requires large thrust block forces as the pipeline snakes its optimum route from the mountain top to the turbine below.
Date:
2002
Client:
EPCOR
Drilling.jpg

Rock and soil anchors at precise angles and capacities were drilled in various soil conditions in very remote, almost inaccessible terrains.

rebar.jpg
rockface.jpg