Summary:
"Run of the river" hydroelectric power requires large thrust block forces as the pipeline snakes its optimum route from the mountain top to the turbine below.Date:
2002Client:
EPCOR
Rock and soil anchors at precise angles and capacities were drilled in various soil conditions in very remote, almost inaccessible terrains.


